Case Studies
University of Sheffield - Elmfield Building Refurbishment
The Elmfield Building, located on the University of Sheffield campus, was transformed as part of a major refurbishment project led by Robertson Group. Heb Mechanical & Electrical delivered comprehensive M&E services, ensuring the building became more accessible, energy efficient, and sustainable.
Barnsley Glass Works Regeneration – M&E Services for a Transformative Project
Heb Group working in conjunction with Henry Boot Construction and Barnsley Metropolitan Borough Council have undertaken a full Met Centre refurbishment, including purpose built meat & fish stalls, general stalls and cafes within Market Kitchen.
Basil Ward Refurbishment Project at Chesterfield Royal Hospital
The Heb Group, in collaboration with Vinci Construction, successfully completed a comprehensive refurbishment of the 30-bed Basil Ward at Chesterfield Royal Hospital. This project aimed to upgrade all systems and create a modern, flexible care environment while minimizing disruption to adjacent live areas.
Broad Street Community Diagnostic Centre
The Heb Group successfully transformed an existing building into the state-of-the-art Broad Street Community Diagnostic Centre in Halifax. This fast-tracked project was completed in just 20 weeks and included comprehensive Mechanical and Electrical (M&E) system installations.
Doncaster Wool Market – Comprehensive M&E Services for a Historic Revitalisation
The Wool Market is a cornerstone of Doncaster’s historic Market District, which includes iconic structures such as the Corn Exchange, Fish Market, and Market Hall.
Fire Safety Compliance Works at Manor House
Heb Group successfully completed essential fire safety compliance works at Manor House assisted living accommodation in Stannington. This project involved critical upgrades, including fire door and alarm replacements, fire stopping, emergency lighting enhancements, and asbestos removal, all conducted in a live environment with 50% occupancy.